Wilshire Bl near UCLA: Storm Drain Work, Sewer and Catch Basin Work Summary Metro contractors will continue working on the storm drain laterals, sewer lines, and catch basin activities for the future Westwood/UCLA Station. Work will be done in phases with lane closures on Wilshire Bl between Veteran Av and Westwood Bl Utility services will be maintained. Work on the sewer and catch basins has been ongoing. The temporary traffic control will require restrictions to eastbound lanes on Wilshire Bl between Veteran Av and Westwood Bl. Date: Ongoing through Winter 2024 Work hours: Monday to Friday, 9 pm to 6 am and 9 am to 3:30 pm Continuous Weekends, Friday to Monday, 9 pm to 6 am Traffic Control:
Noteworthy:
Source: https://cloud.sfmc.metro.net/GayleyAvandWilshireBl_StormDrainWork. |
Tuesday, December 17, 2024
Subway Work
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment