Pages

Friday, April 5, 2013

Train to UCLA Will Take Time

If you are waiting to beat the traffic on the subway to reach UCLA, be prepared for a long wait. 

The 9.4-mile transit project known as the Westside Subway Extension, the Measure R-approved connector from downtown Los Angeles to the Veterans Medical Center in West L.A., was rebranded by Metro as the Purple Line Extension... Construction on the second phase is scheduled to begin in 2019 and will bring a subway station to Wilshire Boulevard at Rodeo Drive by 2026. The third phase is set to begin in 2025 and will see stations built at UCLA in Westwood and the Veterans Administration campus in West L.A...

Full story at http://centurycity.patch.com/articles/westside-subway-extension-renamed-purple-line-extension-f6b732b3

In the meantime, you can hum along:

No comments: