Wilshire Bl near UCLA: Storm Drain Work
Summary
Metro contractors will continue working on the storm drain laterals and catch basin activities for the future Westwood/UCLA Station. Work will be done in phases with lane closures on Wilshire Bl between Veteran Av and Westwood Bl Utility services will be maintained.
For the next two, weeks work will be done at the intersection of Wilshire Bl and Westwood Bl causing reduction in lanes and left turn pockets leading into the intersection. As a result of the planned activities, left turn pockets will be impacted for eastbound and westbound traffic on Wilshire Bl, as well as northbound and southbound Westwood Bl. The work is starting tonight from 10 pm to 6 am.
Date:
Ongoing through August 31, 2024
Work hours:
Monday to Friday, 9 pm to 6 am and 9 am to 3:30 pm
Continuous Weekends, Friday to Monday, 9 pm to 6 am
Traffic Control:
Wilshire Bl will have lane reductions for eastbound traffic between Westwood Bl and Veteran Av.
Left turns may be closed at different times at Gayley Av and Westwood Bl.
Some intermittent crosswalk closures may be implemented. Three crosswalks will be open at each intersection at all times.
Noteworthy:
All work will receive the necessary permits and approvals.
Access to driveways, residences & businesses will always be maintained unless notified in advance.
Access for pedestrians will be maintained outside of construction zones.
Access for the Fire Department and emergency responders will be maintained.
Parking restrictions will be implemented in the immediate area of the work zone.
Construction is dynamic and schedules are subject to change.
- 24/7 Hotline: 213-922-6934
Source: https://cloud.sfmc.metro.net/GayleyAvandWilshireBl_StormDrainWork.