Pages

Saturday, September 29, 2012

405 Weekend Closure Info

Above is the scene as the bridge over the 405 was being deconstructed this morning. You can get traffic flow information by going to the map at:
http://www.dot.ca.gov/hq/roadinfo/metrola.htm and then clicking on the link for road speeds on the lower left.  Or go directly to:
http://www.smartraveler.com/traffic.asp?market=Greater%2BLos%2BAngeles&zone=LosAngeles

Note: The LA Times has a photo gallery showing various stages of construction through the Sepulveda pass beginning in 1929 at:
http://framework.latimes.com/2011/07/13/the-405-a-repeating-history-of-construction/#/0

No comments:

Post a Comment